McGlashen construction begins – A Construção de McGlashen inicia

With consent granted, construction is rapidly underway on the McGlashen Ave site.

The precast concrete boundaries walls were made off site while the ground slab was prepared. These have now been craned into place and are temporarily supported whilst the structural steel portals are fixed. Installation of the first floor joists will soon follow, fitted between the steel portals to allow the upper level timber framing to begin.